DLNG Co2 – Conoco Darwin
Australia
A 680 Ton Absorber is discharged in Darwin Port from the full charter vessel loaded in Ulsan, Korea. The Absorber is unloaded using a tandem lift, carefully managed by the onshore team and ship’s crew, including careful positioning onto hydraulic axles to deliver from the port direct to site.
Categories: Project Experience