Transcar Projects Ltd (145805)
Saudi Air Separation Project 4
Dec 16

A part charter vessel loading in Shanghai for the transport of Chilled Water Towers. Originally despatched from the supplier’s premises by barge, it turned into an immediate barge-to-ship operation since there was insufficient time left on her schedule to load the remaining batch. This material was amongst 4,500 Frts of ancillary equipment and subcomponents loaded.

Categories: