Preservation works best when the requirements are set before the equipment leaves the supplier. Sensitive equipment may remain at a port, laydown area or temporary storage facility before installation. Depending on the manufacturer's instructions, preservation may cover moisture control, corrosion protection, protective covers, inspection intervals and specific storage conditions. Once those requirements are known, they can be built into the packing, storage and handling arrangements. Bringing manufacturer-prescribed requirements into the logistics plan from the start keeps them in view throughout the move. If your equipment has specific preservation requirements, share them with your logistics team at the planning stage. #ProjectCargo #ProjectLogistics #Transcar