Project Overview

Transcar Projects, in partnership with its joint venture (JV) partners, was awarded a substantial 2 million freight ton contract for the Qatar GTL (Gas-to-Liquids) project. This ambitious project involved the award of three combined EPC (Engineering, Procurement, and Construction) contracts as part of what was, at the time, the world’s largest greenfield GTL complex (a one square kilometre site)


The Challenge

The aggressive construction schedule of the Qatar GTL project required peak shipping activity to reach 180,000 freight tons of cargo arriving at the site per month. This level of activity demanded state-of-the-art tracking systems, as well as professional implant teams at three key global control points: London, Japan, and Qatar. The challenge was to manage this immense logistical operation over a five-year period, ensuring that all components arrived on time and were seamlessly integrated into the construction process.


Engineered Solution

To meet the demands of this project, Transcar Projects implemented a sophisticated tracking system that allowed for real-time monitoring of all shipments. This system was crucial in managing the flow of materials and equipment, ensuring that everything arrived at the right place at the right time.





In addition to the tracking system, Transcar provided professional implant teams at the three global control points. These teams were responsible for coordinating logistics operations across multiple time zones, ensuring that any issues were addressed immediately and that the project remained on schedule.


Transcar's logistics plan also included contingency strategies to mitigate potential delays or disruptions whilst maintaining the highest standards of safety. This included the use of alternative shipping routes and backup transportation options, which were pre-approved by the client and ready to be implemented if necessary.


Outcome

The Qatar GTL project was successfully completed, with all shipments arriving on time and within budget. The aggressive shipping schedule was met without any significant delays, thanks to the precise coordination and advanced tracking systems implemented by Transcar Projects. The client was impressed with the efficiency and reliability of the logistics operations, reinforcing Transcar's reputation as a leader in project freight forwarding.